TSB
screen printing => General Screen Printing => Topic started by: allyeds3 on September 13, 2011, 10:16:59 PM
-
1596 pieces. Black on assorted. Leg prints and back prints. Split between. . 4 hours. Manual presses. No other help except dryer catcher. I think it was good. Ya?
-
Is there a typo in your post?
-
Said press(es) and black (one color assumed). Assuming the Leg and Back were tallied in the 1596.
My math says 1596 / 2 (presses) = 798 / 4 (hrs) = 199.5 per hour / 60 (mins) = 3.35 a min.
It's cranking and a grind, but with the mentioned dryer/catcher, sounds do-able. Providing my math and the story match.
-
thats beer time, so really all day...lol
-
1596 pieces. Black on assorted. Leg prints and back prints. Split between. . 4 hours. Manual presses. No other help except dryer catcher. I think it was good. Ya?
1600 pieces on a manual in 4 hours, I don't care how many you have, that's good time!
pierre
-
That is good time, and makes me thankful for an auto.
Even when the stupid air on it it jacked up and is frustrating as hell.